Before roof replacement:

delivery, installation, and cleanup

The best time to settle delivery access, material choices, and communication is before installation day. Use this checklist to make sure you and your contractor have the same plan for your home.

By Array Remodeling · Updated October 15, 2026

Confirm the selection before materials are ordered

Write down the product line, color, and any separate metal or gutter finish. Look at a physical sample where possible and discuss how it relates to your siding and trim. A screen image is a starting point for a selection conversation.

Ask whether an HOA review applies and who will handle it. Confirm any chosen upgrades in writing, including price and availability, before the order is finalized. Keep that record with your signed scope.

Agree on access and the delivery plan

Ask where the delivery vehicle and debris container will go, which areas need to stay clear, and whether a delivery date is separate from the installation date. Confirm the arrival window with your project contact ahead of delivery.

Point out access constraints early: a shared driveway, a narrow gate, parked vehicles, landscaping, or a location that needs to remain accessible. If solar equipment or other work needs coordination, ask who owns that schedule before setting the roof date.

—  Confirm the delivery location and the area to clear.

—  Discuss vehicles, gates, pets, and access needed during the work.

—  Identify landscaping or exterior items that need special attention.

—  Save the project contact's number and the latest schedule.

Know how changes will be communicated

Ask for the planned start, an estimated duration, and the factors that could change the sequence. A small roof and a home with multiple materials or coordinated trades will each have their own timetable.

Agree on who sends weather updates and when you should expect the next message if work moves. Ask how the property will be left if the job takes more than one day.

Before tear-off, ask how newly exposed conditions will be documented and how extra work will be approved. Request a clear description and price for any proposed change. Photographs help connect a change request to what was found.

Make cleanup and closeout part of the plan

Discuss debris removal, the driveway and yard check, and the final walkthrough. Ask when the container and unused materials will leave. If you notice something afterward, send the location and a photo to the project contact so it can be addressed.

Ask for completion photos and the warranty documents that apply to your actual installation. Keep any remaining punch-list items in writing, with a responsible contact and a next step.

The project file should make three things easy to see: what was completed, what remains to be resolved, and which payments have been recorded. If insurance is involved, ask the insurer separately what completion documents it requires.

Start with the condition

of your home.

Keep planning.

ROOF DECISIONS

Roof repair or replacement: what should you ask?

Compare roof repair and replacement with a clear inspection, photos, and written scope. Questions for Northern Virginia homeowners before choosing a contractor.

SCOPE & ESTIMATES

Roofing proposal and insurance estimate: how to compare them

A practical checklist for comparing roof scope, materials, exclusions, and optional upgrades with an insurance estimate before you authorize the work.

bottom of page